Pricing

We pride ourselves on transparent pricing, with a simple payment plan.

Our open and transparent pricing is designed to be affordable and fair. Please see below for the breakdown in instalments.

We require a 5% Deposit on signing of the contract which confirms your build slot. We then work on a progress payment system detailed below.

We Invite you to come and view the build at any stage, with prior appointment.


NZD $230,000 Inc. GST


 

Deposit - 5%

We require a 5% deposit on signing of the contract.
This secures your build slot.

Instalment 1
15%

Preliminary material ordering stage

Due three weeks prior to estimated build start date.

Instalment 2
35%

Roof on stage of the build

All timber framing completed, roof system installed, ready for joinery and cladding.

Instalment 3
35%

Lock up stage of the build

Home is water tight and can be locked. All cladding, joinery, flashings, guttering, down pipe, installed. Electrical cables, water and gas pipes laid. Painting and Interior fit out commences.

Instalment 4
10%

The final payment is due before the home leaves our yard.

 

Contact us to secure your build slot.