We pride ourselves on transparent pricing, with a simple payment plan. Please see below for the breakdown in instalments.
Deposit is required upon signing the contract, which confirms your build slot. We then work on a detailed delivery plan and progress payment system, similar to the below.
We invite you to come and view your build at any stage, with prior appointment.
01
Deposit
Secure your build timeline.
We require a 5% deposit on signing of the contract.
This secures your build slot.
02
Instalment 1
15%
Preliminary materials are ordered.
Payment due 5 weeks prior to estimated build start date.
03
Instalment 2
35%
Roof is built.
All timber framing is completed, roof system installed, ready for joinery and cladding.
04
Instalment 3
35%
Lock up stage of the build
Home is water tight and can be locked. All cladding, joinery, flashings, guttering, down pipe, installed. Electrical cables, water and gas pipes laid. Painting and Interior fit out commences.
05
Instalment 4
10%
Ready for delivery.
The final payment is due before the home leaves our yard.